Influent Pump Station Concrete Slabs Reconstruction

Product Related Information

  • PIPS Forcemain - Petaluma

    The City of Petaluma operates the Primary Influent Pump Station (PIPS) which collects wastewater from nearly the entirety of the City of Petaluma and delivers it to the Ellis Creek Water Recycling Facility (ECWRF) through a single 36-inch forcemain. The PIPS forcemain delivers up to 35 Million Gallons Per Day (MGD) of sewage to the City's

    GET A QUOTE
  • Recommendations from Value Engineering Studies on Wastewater Treatment …

    Prefabricated Pump Station for Cast-In-Place Pump Station In the original concept, the designer proposed a cast-in-place pump station with four horizontal constant speed pumps. The station …

    GET A QUOTE
  • 2020 Department of Public Works Program - Waukesha, WI

    10/9/2019 · Return Flow Pump Station, Phosphorus Removal Improvements and Primary Influent Pump Replacement July Heyer Park Tennis Court Reconstruction JW $500,000 JH 3 April 6May 30% Plan - March 20 2020 Sidewalk Repairs April 4 Grandview and Meadowview

    GET A QUOTE
  • Watts Constructors : Projects

    The 40 MGD EWTP consisted of an 80 CFS Influent Pump Station, four (4) 110-ft. diameter Sedimentation Tanks, two Slurry Pump Houses, seven Mix Tanks with Chemical Feed Building and Storage. The Effluent Distribution Structure supplies multiple end water users.

    GET A QUOTE
  • Regional Pump Station Upgrades - CONSTRUCTION JOURNAL

    To upgrade three separate pump stations. The project includes installation of new electrical main disconnect switches, replacement of PLC and HMI's, installation of soft starts for pumps, replacement of an automatic transfer switches, concrete rehabilitation within the wetwells and influent channels, wetwell and channel linings, and the installation of new plug valves.

    GET A QUOTE
  • Central Wastewater Treatment Plant Influent Pump Station & …

    Upon completion, the IPS pumping capacity of 335 MGD is the largest deepest-capacity based Vertical Turbine Solids Handling (VTSH) pumps installed in the United States. This technically challenging project showcased a variety of our well rounded team's attributes, which include; deep excavation and shoring (over 80 ft deep excavation) dewatering,

    GET A QUOTE
  • Creve Coeur Pump Station - KCI - 314-894-8888 314-200-6496

    After sheetpile installation, the entire site was vibrocompated prior to excavation, and the pump station then built with 5′-0″ thick footing slabs and walls. Additionally, project scope included over 1,000 linear feet of influent force main and discharge piping, ranging in size from 30″ ductile iron pipe to 72″ reinforced concrete pipe.

    GET A QUOTE
  • Bypass Pumping Plans Construction Consulting | Stiver Engineering

    That said, the first major stage of the project, which includes the reconstruction of the influent pump station at the City's Wastewater Treatment Plant, is scheduled for FY 2022. This new influent pump

    GET A QUOTE
  • Capital Improvement Plan - Fredericksburg, VA

    Wastewater Technology Fact Sheet: In-Plant Pump Stations

    GET A QUOTE
  • Mattawoman WWTP losed Loop - ACE

    existing pump station. This can be split into three different phases – the electrical room expansion, the effluent pump upgrade, and the influent pump upgrade. oth pump upgrades require a large bypass system that must be able to handle a 45 MGD peak flow

    GET A QUOTE
  • Bowman Civil & Site Engineering - Bowman

    Wastewater Technology Fact Sheet: In-Plant Pump Stations

    GET A QUOTE
  • Capital Improvement Plan - Fredericksburg, VA

    station at the City's Wastewater Treatment Plant, is scheduled for FY 2022. This new influent pump station work will be necessary regardless of whether the City maintains a separate treatment plant or is able to combine with the County's treatment plant.

    GET A QUOTE
  • station concrete Bids, RFPs & Government Contracts

    Wastewater Technology Fact Sheet: In-Plant Pump Stations

    GET A QUOTE
  • Reunion Ranch – Water Control and Improvement District (WCID)

    23/7/2021 · The contractor moved the SADDS skid from inside the pump building to the new concrete pad. The influent lift station liner installation is approximately halfway complete. The contractor is starting to coordinate start-up of the new lift station which will require a combination of by-pass pumping and hauling operation in order to divert incoming wastewater during the connection efforts.

    GET A QUOTE
  • Watts Constructors : Projects

    The 40 MGD EWTP consisted of an 80 CFS Influent Pump Station, four (4) 110-ft. diameter Sedimentation Tanks, two Slurry Pump Houses, seven Mix Tanks with Chemical Feed Building and Storage. The Effluent Distribution Structure supplies multiple end water users.

    GET A QUOTE
  • Awards | st. louis section - ASCE

    The project included expansion of an influent pump station, new flow monitoring and diversion facilities, nearly 5000 LF of pipe from 88-inches to 144-inches in diameter, two 35-foot diameter covered grit collection basins, four channel grinders, four 133-foot

    GET A QUOTE
  • CSO 6 and 7 (Storage Tank and Pump Station Renovation) | DLZ

    CSO 6 and 7 (Storage Tank and Pump Station Renovation) The Board of Public Works retained DLZ for the CSO 6 and 7 project. The project responsibilities included. The City's CSO Long Term Control Plan, approved in 2011, required building a 1.0 MG storage and pump facility. The CSO 6 and 7 facility is located where Jackson Boulevard crosses the

    GET A QUOTE
  • Technical Memorandum CONDITION ASSESSMENT AND …

    2.1 Influent Pump Stations (IPS) The RBWWTP was originally constructed with an influent pump station (IPS) that consisted of eight submersible pumps in a wet well which will be referred to throughout this technical memorandum as IPS #1. In 2001, a second

    GET A QUOTE
  • Chapter 2 Brightwater Treatment System

    Chapter 2. Brightwater Treatment System Figure 2-6. Towing of the Outfall Pipes Influent Pump Station The Influent Pump Station, located at the North Creek Portal, is designed to pump up to 130 mgd of wastewater to the Brightwater Treatment Plant. The pump

    GET A QUOTE
  • PROPOSAL

    KAILUA RWWTP – TUNNEL INFLUENT PUMP STATION AND HEADWORKS FACILITY JOB NO. W1-13 PROPOSAL SCHEDULE Item No. Description Estimated Quantity Unit Price Total Basic Bid 1 Mobilization, (not to exceed 6% of

    GET A QUOTE